1866 Isle of Wight Railway
Three years after the opening of the Ryde-Shanklin section of this railway, the final stage to Ventnor, which incorporated a 1312 yard long tunnel, opened on 10th September 1866. Sadly […]
Three years after the opening of the Ryde-Shanklin section of this railway, the final stage to Ventnor, which incorporated a 1312 yard long tunnel, opened on 10th September 1866. Sadly […]
E. [email protected]
T. 01983 882204
Sign up to our newsletter
The Isle of Wight Railway Company an accredited museum limited by guarantee and registered in England No 1068690. A registered educational charity No 280918.
VAT No. 615160080Â
Brand Partner: AI Studio
© 2025 The Isle of Wight Railway Company Ltd.